The Metcalf Park Ball Field Repairs included the following:
- Aerate and power seed all grass areas on field.
- Restore fields to proper dimensions including squaring the fields and resetting the bases.
- Fertilize and lime the fields.
- Sod cut outer perimeter of grass edges removing all lips minimum 2’ on outer infield ARC and both baselines foul territory 1st and 3rd leave 7’ basepaths.
- Add 2,500 ft sod to outer perimeter to define field edge and add 20 tons of red arning track mix to outer perimeter of fence line track.
- Redistribute infield mix, rototill field and regrade the playing surface to establish proper heights and restore field dimensions to 60/90 specs.
- Add clay bricks and surface mound clay to mound and batters box.
- Add 50 tons diamond tex premium infield mix and finish grade using ABI Z23SL laser ready groomer.
- Add 40 bags (1 ton) pros choice red infield conditioner and roll field with two (2) ton vibratory roller for completion.